Question about 7A QB. I am probably missing an important instruction (surely) somewhere. I made all the pushrods as called for on Sht 38 of the plans. When I went to install the elevator bellcrank and pushrods, I find that the small F-789 pushrod cannot be inserted into position from either end without interference from the bulkheads. It appears to be aout an inch too long to insert from the rear, but before I drill out the rivets for the rod end bearing on one (or both) ends I thought I would ask where the plans said to assemble the rod ends with the rod in its position in the fuselage, or is there some other majic to this?