fieldbaren
Member
I purchased a beautiful RV6A last October. while doing the condition Inspection I decided to comply with the Overhead Rudder Pedal service bulletin. after 3 days being under the panel
I pulled all the bolts, and cotter pins that hold the hydraulic cylinders in place ; a nasty job!! then I removed all the bolts holding the nylon blocks in place. it was cool until I found out there wasn't enough room the remove the rudder pedal assembly. Obviously, this assembly was put in before everything else was enclosed with sheet metal! I can't get the end blocks past the
bulkhead no matter what I try! And it's impossible to remove those end blocks; just too tight!!
So if anyone was able to comply with this bulletin, please let me know how you did it!
Thanks
Fieldbaren
I pulled all the bolts, and cotter pins that hold the hydraulic cylinders in place ; a nasty job!! then I removed all the bolts holding the nylon blocks in place. it was cool until I found out there wasn't enough room the remove the rudder pedal assembly. Obviously, this assembly was put in before everything else was enclosed with sheet metal! I can't get the end blocks past the
bulkhead no matter what I try! And it's impossible to remove those end blocks; just too tight!!
So if anyone was able to comply with this bulletin, please let me know how you did it!
Thanks
Fieldbaren