Time to register the aircraft, I bought the guide book published by the EAA, followed it to the letter, and mailed my documents via certified mail on July 8th (was told by the postal employee it would arrive on Monday, July 12th). My $5.00 check was deposited and the certificate was mailed on the 15th, and it arrived on the 19th.
An eleven day turnaround? Out of the government?!
An eleven day turnaround? Out of the government?!
Last edited: