hey all
does anyone have a decent illustration of the 6111 skin reinfrocement ribs in place or advice on the method used to cut and form them?
one more question.
i notice the manual would have me fix the baggage floor down permanently in another step or two
do i not need this open to pass wiring to the rear of the fuselage? or at least create a chase through one of the bagage floor ribs between 705 and 706 for later wiring? is this one of those spots not well addressed in the manual or is there an alternate route used by most for the wiring that has to reach the rear of the plane
thanks in advance
does anyone have a decent illustration of the 6111 skin reinfrocement ribs in place or advice on the method used to cut and form them?
one more question.
i notice the manual would have me fix the baggage floor down permanently in another step or two
do i not need this open to pass wiring to the rear of the fuselage? or at least create a chase through one of the bagage floor ribs between 705 and 706 for later wiring? is this one of those spots not well addressed in the manual or is there an alternate route used by most for the wiring that has to reach the rear of the plane
thanks in advance