300 ish, most airframes require extensive rewiring, new alt with BU alt usually, all new lights, new pitot-static system, etc. etc..That's beautiful Walt.
May I ask, for an experienced person like yourself, how many hours to do that installaton?
Because I had a hole in aft fuselage where a previous strobe was located, that’s where I put it (I try to avoid making unnecessary holes).Can you say where you located the GHA15? Thanks. A picture , if you have one.
Another beautiful panel Walt....Looks great Walt.
Probably wish you had a small person to pull wire for you.
That has to be a PITA.
BOOMER
You do nice work Walt.
Thank you Walt.Because I had a hole in aft fuselage where a previous strobe was located, that’s where I put it (I try to avoid making unnecessary holes).
In reality the change in height from a more centered location is minimal. Had a hole not been there I would have put it just forward of the pitch servo.