Are there requirements to have a detailed log book entry for all items during Phase One? Such as accessories on the aircraft, or other items that are installed or removed for testing purposes?
My Ops Specs simply states a 12 month Conditional Inspection must be completed, with a log entry by a qualified person.
And, after Phase One is complete, a new log entry with the required info.
Is that all that is required per the FAR’s? I have searched but can’t find an answer.
My Ops Specs simply states a 12 month Conditional Inspection must be completed, with a log entry by a qualified person.
And, after Phase One is complete, a new log entry with the required info.
Is that all that is required per the FAR’s? I have searched but can’t find an answer.
Last edited: