So, I did not skip any steps. Initialed them as I went but after attaching the elevators and setting up the travel the directions just stop!?
No where in the directions does it tell me to connect the rudder. Doesn't even give me a length to set the hinge bearing bolts to and the elevator was very specific about that. Am I missing something?

I have a completed Vertical, Horizontal stabilizer, a rudder, 2 elevators that are attached. I did some trimming on the tips but won't attach them till the end.

I have 2 months till the wings are due to show. What now??

toolman
Reply With Quote
  #2  
Old 07-29-2022, 04:09 PM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 5,498
Default Plans

Quote:
Originally Posted by toolmanmike View Post
So, I did not skip any steps. Initialed them as I went but after attaching the elevators and setting up the travel the directions just stop!?
No where in the directions does it tell me to connect the rudder. Doesn't even give me a length to set the hinge bearing bolts to and the elevator was very specific about that. Am I missing something?

I have a completed Vertical, Horizontal stabilizer, a rudder, 2 elevators that are attached. I did some trimming on the tips but won't attach them till the end.

I have 2 months till the wings are due to show. What now??

toolman
Dimensions are in there somewhere. Seems like they are on the plans. Bearing dimensions are there. I used a section of polished steel rod. Easy to measure and get them in line.
__________________
Larry Larson
Estes Park, CO
E-mail: wirejock at yahoo dot com
Builder Blog: http://wirejockrv7a.blogspot.com
Donated 12/01/2021, plus a little extra.
RV-7A #73391, N511RV reserved
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #3  
Old 07-29-2022, 04:35 PM
agent4573 agent4573 is offline
 
Join Date: Aug 2019
Location: Mountain view
Posts: 559
Default

Dimensions are on the drawing but not in the instructions. The instructions normally go step by step for most things once, after that they just expect you to look at the drawings and know how to do things. By the end of your build, youll barely reference the instructions and just be looking at whatever drawing you need.

If you want to glass in the tips, do that now. It'll give you something to do and you never have to run a wire in the tail tips (minus the rudder bottom) so you don't have to delay them like the wingtips. Read the wing assembly instructions a few times to get an idea of the order of things. Go read the 20+ page thread on plan "gotchas" so you know what to avoid with the wings. Make a schedule for long lead items. Andair fuel valves can take 6 months to deliver, sam James up to a year for a cowl, Lycoming is over a year long wait right now. Make the list of what you want to include in the build and build a schedule of when you need to put the order in. There's plenty to do until the wings arrive....
__________________
www.rv7build.com - out of date, will be updated soon
N69ER - built and flying - 2022 Bronze Lindy
Reply With Quote
  #4  
Old 07-30-2022, 07:57 AM
sahrens's Avatar
sahrens sahrens is offline
 
Join Date: Jan 2007
Location: Battle Ground
Posts: 576
Default Rudder

The attachment instructions are at the end of the fuselage section. Look at page 8-18. I recommend reading the instructions and studying the plans for your wings while waiting for your wing kit. If your wing kit is QB make sure you know what is left to do. If itís a SB kit set up your shop for and build the wing jig, watch the Vans video on fuel tank construction, and start planning what accessories you will install in wing (landing lights, position lights, Pitot/AOA, roll servo, etc.).

Two months will go by pretty fast.
__________________
Scott
RV-7 N818BG (flying)
Bearhawk Patrol (building)
RV-7 (resurrecting)
Reply With Quote
  #5  
Old 07-31-2022, 08:45 AM
BillL's Avatar
BillL BillL is offline
 
Join Date: Sep 2007
Location: Central IL
Posts: 6,741
Default Suggestion before calling done.

I left my tips until later and concluded it would have been better to have it done well before the final assembly. Fill rivet gaps, center holes of pull rivets and finish all the balancing with tips all primed and ready for paint.

BTW the blue film is about the same area density as final prime/paint.
__________________
Bill
RV-7
Reply With Quote
  #6  
Old 07-31-2022, 09:12 AM
nohoflyer nohoflyer is offline
 
Join Date: Sep 2018
Location: Brooklyn, NY
Posts: 324
Default

I constructed all the pieces and stored them all unassembled.
__________________
RV-7A builder
A320 Capt at some airline
T-37/T-38/KC-135
C-177/172
Piper Warrior
2022 donator
Emp complete
Wings complete
Working on fuselage
Reply With Quote
  #7  
Old 08-27-2022, 09:10 AM
toolmanmike toolmanmike is offline
 
Join Date: Sep 2018
Location: Woodbury, PA
Posts: 23
Default

Original poster here, I am just about finished with the fiberglass on the empennage. I did some research here and built my wing cradle and a rolling fuselage dolly as well. Took a tour of the Lycoming plant! Really cool! Cleaned the shop, read every post here on VAF. Still gonna be waiting for 6 weeks or so till QB wings and fuse get here.
Should I install the elevator and rudder to vertical and horizontal now or let them separate till time to mount on the fuselage?

Any advise on receiving the QB shipment? Does it come as wings for cradle, fuselage for dolly, and a big box with all the pieces? What am I missing?

Toolmanmike
Reply With Quote
  #8  
Old 08-27-2022, 09:31 AM
wirejock's Avatar
wirejock wirejock is offline
 
Join Date: Oct 2005
Location: Estes Park, CO
Posts: 5,498
Default Assembly

Quote:
Originally Posted by toolmanmike View Post
Original poster here, I am just about finished with the fiberglass on the empennage. I did some research here and built my wing cradle and a rolling fuselage dolly as well. Took a tour of the Lycoming plant! Really cool! Cleaned the shop, read every post here on VAF. Still gonna be waiting for 6 weeks or so till QB wings and fuse get here.
Should I install the elevator and rudder to vertical and horizontal now or let them separate till time to mount on the fuselage?

Any advise on receiving the QB shipment? Does it come as wings for cradle, fuselage for dolly, and a big box with all the pieces? What am I missing?

Toolmanmike
You can install them but they will come back apart. HS and VS have to be drilled mounted. Very difficult if control surfaces are installed.
__________________
Larry Larson
Estes Park, CO
E-mail: wirejock at yahoo dot com
Builder Blog: http://wirejockrv7a.blogspot.com
Donated 12/01/2021, plus a little extra.
RV-7A #73391, N511RV reserved
Disclaimer
I cannot be, nor will I be, held responsible if you try to do the same things I do and it does not work and/or causes you loss, injury, or even death in the process.
Reply With Quote
  #9  
Old 08-27-2022, 11:09 PM
sahrens's Avatar
sahrens sahrens is offline
 
Join Date: Jan 2007
Location: Battle Ground
Posts: 576
Default

Quote:
Originally Posted by toolmanmike View Post
Original poster here, I am just about finished with the fiberglass on the empennage. I did some research here and built my wing cradle and a rolling fuselage dolly as well. Took a tour of the Lycoming plant! Really cool! Cleaned the shop, read every post here on VAF. Still gonna be waiting for 6 weeks or so till QB wings and fuse get here.
Should I install the elevator and rudder to vertical and horizontal now or let them separate till time to mount on the fuselage?

Any advise on receiving the QB shipment? Does it come as wings for cradle, fuselage for dolly, and a big box with all the pieces? What am I missing?

Toolmanmike
It comes with all of that and a gazillion parts, bolts, washers and rivets to inventory. Vans will Make-up shortages but there is a time limit, 30 days? So you might want to determine where all that stuff will be stored. Storing in a very organized manner will speed up the process of, where did I put that part.
__________________
Scott
RV-7 N818BG (flying)
Bearhawk Patrol (building)
RV-7 (resurrecting)
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 11:47 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.