VansAirForceForums  
Home > VansAirForceForums

-POSTING RULES
-Advertise in here!
- Today's Posts | Insert Pics

Keep VAF Going
Donate methods

Point your
camera app here
to donate fast.






VAF on Twitter:
@VansAirForceNet

Prev Previous Post   Next Post Next
  #1  
Old 10-05-2022, 02:11 PM
hamblin10's Avatar
hamblin10 hamblin10 is offline
 
Join Date: Aug 2021
Location: Owasso, OK
Posts: 50
Default W-1201A Doubler warning

Does the warning on page 17-02 make sense about protecting the LH wing spar caps from being drilled to #20 by inserting a steel strip? If you do not drill through the stack and open the holes then how are you going to install the BSPQ-5-2 rivets? Thanks!
__________________
Eric Hamblin
Private Pilot/A&P/Aerospace Engineer
RV-12iS in progress. N993EZ
Build 121398
Empennage kit received 8/11/22
Wing kit in work 07/11/22
Fuselage kit ordered 03/07/22
Finish kit ordered 03/18/2022
Owasso Oklahoma

https://eaabuilderslog.org/?s=MYRV12
Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 04:54 PM.


The VAFForums come to you courtesy Delta Romeo, LLC. By viewing and participating in them you agree to build your plane using standardized methods and practices and to fly it safely and in accordance with the laws governing the country you are located in.