In September, 2022, Van's updated the instructions for step 4 on page 23iS/U-03 (installing the F-01205C-1) to indicate that two rivets should not be installed. I'm mystified by this change. I can't find anything that will be installed in this area in the plans and I don't see where those rivets are eventually installed. It looks like once the fuel tank is installed those rivets will be difficult to reach. It also looks like only the two rivets on the left side of the part are omitted, and this asymmetry is also bothering me.
Can anyone shed any light on whether the omission should be applied to both sides of the F-01205C-1 and where these rivets are ultimately installed?
Thanks!
Can anyone shed any light on whether the omission should be applied to both sides of the F-01205C-1 and where these rivets are ultimately installed?
Thanks!